Quality above all else.
Application control.
Field quality control.
5. IMPACT AND COMPRESSION RESISTANCE
With the sclerometer, we check, on site, the resistance of the sub-base before and after the coating.
7. ADHESION TEST
With Erichsen Adhesion, we check the degree of adhesion of the coating to the subbase, thickness of the coating and degree of impregnation of the floor.
